S   RIMAC CONCEPT S

⭐⭐⭐⭐⭐⭐

⛽ 3 fuels
  85/25/29/38/54/69 (300)

Stock [3089]

 365 km/h

 78.85

 46.73

 41.74



⭐ [3277]

 366.5 km/h

 79.6

 50.95

 45.39


85 

⭐⭐ [3497]

 368.3 km/h

 80.48

 55.9

 49.7


110 

⭐⭐⭐ [3733]

 370.2 km/h

 81.41

 61.19

 54.29


139 

⭐⭐⭐⭐ [3976]

 372 km/h

 82.39

 66.88

 58.9


177 

⭐⭐⭐⭐⭐ [4260]

 373.9 km/h

 83.6

 73.81

 63.99


231 

Max w/o epics [4272]

 374.3 km/h

 83.53

 73.33

 64.86


300 

Gold [4528]

 376.3 km/h

 84.53

 79.9

 69.86



Stock [3247]

 366.2 km/h

 79.47

 50.28

 44.82

⭐ [3435]

 367.7 km/h

 80.22

 54.5

 48.47

⭐⭐ [3655]

 369.5 km/h

 81.1

 59.45

 52.78

⭐⭐⭐ [3891]

 371.4 km/h

 82.03

 64.74

 57.37

⭐⭐⭐⭐ [4134]

 373.2 km/h

 83.01

 70.43

 61.98

⭐⭐⭐⭐⭐ [4418]

 375.1 km/h

 84.22

 77.36

 67.07

Max w/o epics [4430]

 375.5 km/h

 84.15

 76.88

 67.94

Gold [4686]

 377.5 km/h

 85.15

 83.45

 72.94

From Stock to Stage 3
 482,000 

 3 3 3 3 + 1,080,000 
 0 0 0 0 + 0 
 0 0 0 0 + 0 

= 1,562,000 

⭐⭐

From Stock to Stage 6
 2,090,000 

 4 4 4 4 + 1,440,000 
 1 1 1 1 + 720,000 
 0 0 0 0 + 0 

= 4,250,000 

⭐⭐⭐

From Stock to Stage 8
 4,536,000 

 6 6 6 6 + 2,160,000 
 2 2 2 2 + 1,440,000 
 0 0 0 0 + 0 

= 8,136,000 

⭐⭐⭐⭐

From Stock to Stage 10
 9,330,000 

 7 6 6 7 + 2,340,000 
 2 3 3 2 + 1,800,000 
 1 1 1 1 + 2,160,000 

= 15,630,000 

⭐⭐⭐⭐⭐

From Stock to Stage 12
 18,726,000 

 7 6 6 7 + 2,340,000 
 3 5 5 3 + 2,880,000 
 2 2 2 2 + 4,320,000 

= 28,266,000 

⭐⭐⭐⭐⭐⭐

From Stock to Stage 13
 27,726,000 

 7 7 7 7 + 2,520,000 
 5 5 5 5 + 3,600,000 
 4 4 4 4 + 8,640,000 

= 42,486,000 

Upgrades

[1] 23,000
[2] 37,500
[3] 60,000
[4] 90,000
[5] 130,000
[6] 182,000
[7] 255,000
[8] 356,500
[9] 499,500
[10] 699,000
[11] 979,000
[12] 1,370,000
[13] 2,250,000

Parts

Uncommons: 7 x 90000 x 4 = 2,520,000 
Rares: 5 x 180000 x 4= 3,600,000 
Epics: 4 x 540000 x 4= 8,640,000 

Stages Total: 27,726,000 
Parts Total: 14,760,000 

Total: 42,486,000 

Extra

All Nitros speed: ? km/h 
Air Speed: ? km/h

 24h: 20  | 7d: 105